In 2024, more than 16,000 new elevators were installed across the UAE, projected to exceed 19,000 by 2030. Today, an elevator is far more than a mechanical convenience; it is an essential feature that enhances mobility, accessibility, and the overall value of a property, whether residential or commercial.
However, its true barriers start after the purchase: when undertaking elevator installation. From structural assessment to construction approval, every step is crucial. Here, we have outlined a step-by-step process for you.
1. Preliminary Assessments and Planning
This process starts before any work commences on an elevator installation project.
For this, consider the building’s requirements, such as:
traffic flows
occupancy limits
future expansion projections
Next, identify the best locations for elevator installation. It needs to be structurally feasible. Further, consider the building's foundation. Ensure it is solid. Also, check the building's load-bearing capacity. This measure helps ensure the building can support the elevator system.
Work with the architect or engineer to avoid any mistakes at this stage.
2. Design and Customization
The elevator design must meet specific building needs and local codes. You may choose between the hydraulic and traction elevator. The choice depends on:
available space
speed requirements
height
Custom specifications are also vital. Decide on these attributes to ensure the elevator complements the building's aesthetics and functionality:
door configurations
capacity
interior finishes
Next, account for the future usage specifications. The installation of a home elevator can increase the property's value by at least 10%, making it a worthwhile long-term investment for resale.
3. Construction Preparation
There is a need to prepare the building for the elevator installation by constructing a foundation and pit that must bear and withstand the weight and stresses exerted by the elevator.
For this:
Apply waterproofing methods
Install drainage to prevent moisture damage
Erect the hoistway with proper shaft construction and wall reinforcements
Use code-compliant safety materials throughout the hoistway
Install electrical wiring, power supply lines, and control panel connections
Ensure mechanical readiness for system integration
Allocate space for the temporary storage of tools and elevator components
4. Delivery and Installation
Upon completion of construction preparation, the components are delivered and installed in the designated hoistway. This phase involves the mechanical installation of elevator components, including elevator cars, counterweights, and guide rails.
Wiring and cabling should be carried out with great care. Also, integrate emergency mechanisms and electrical controls to avoid future inconveniences.
5. Safety Inspections
During installations, strict safety checks will be conducted as required by law to ensure passenger safety. Additionally, verification of conformity with safety regulations must be carried out.
It includes:
installing the emergency brake
ensuring materials comply with fire rating standards
evaluating the elevator’s performance under different conditions, load testing, and emergency operations
6. Testing and Final Adjustments
After the elevator is operational, fine-tuning begins. The process involves smoothing the ride and ensuring that everything proceeds as planned. Everything is taken into account, from the speed of door opening to the softness of the elevator halting. It is the last chance to check for anything that needs fixing before the system is signed off and handed over.
During this phase:
Adjust motor controls for optimal speed and efficiency
Calibrate acceleration and deceleration for a smooth ride
Set door opening and closing times for safety and comfort
Run performance tests under various load conditions
Identify and fix any irregularities
Final certification is issued once all checks have been passed.
7. Handover and Maintenance
The elevator shall be handed over to the users after successful testing and certification. Regular maintenance is crucial to ensure an elevator operates optimally and safely. It includes astronaut inspections, lubrication, and replacement of components to increase the elevator system's life expectancy and ensure its reliability into the future. Typically, a maintenance and servicing plan is recommended that is geared towards their usage maintenance.
In a nutshell, elevator installation requires detailed planning, expert workmanship, and strict adherence to safety guidelines.